Laserfiche WebLink
• 2.03.6(1) <br />Loadout: <br />The loadout has been released from the permit application package. <br />(2) The applicant has no right to mine coal at the mine sites. The mines <br />have been sealed and the disturbed areas reclaimed. <br />2.03.7 Relationship to Areas Designated Unsuitable for Mining <br />The project area does not encompass any fragile or historic lands nor <br />are there any natural hazards present which preclude the planned <br />operations. The proposed permit area is not currently designated or <br />under consideration as unsuitable for surface mining operations by <br />either federal or state authorities. <br />2.03.8 Permit Term Information <br />Mining activities have ceased. All facilities have been dismantled and <br />the area has been reclaimed. It is anticipated the Mining Permit will <br />be in effect for many years due to the mine drainage. The current <br />permit is to be issued effective, 2008 for a five year term. <br />• <br />2_g 05/10 <br />