Laserfiche WebLink
on Peabody's (now WFC's) commitment to protect the hydrologic balance by minimizing and <br />mitigating the disturbance using the engineering design and mining and reclamation plans <br />referenced on the above pages in Attachment 2.05.6(3)(b)(v) (formerly Peabody Tab 16). Toward <br />this end, WFC will stake the buffer zone and disturbance limits along Calamity Draw to assure <br />adherence to the approved limits of disturbance. <br />Any range or coal fires will be controlled or suppressed and their prevention will be encouraged to <br />the extent possible. Excluded are those fires approved by the DRMS as part of a management plan. <br />The majority of traffic will be in the active pit, spoil, and facilities areas. Other roads will be light duty <br />roads with a minimal impact to wildlife. The replaced east -west county road will be replaced to its <br />present location with the right -of -way fenced after the road is reopened. <br />(Revised July 2014) 2.05.6(2) -7 <br />