2014-08-07_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-08-07_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 1:59:56 PM
Creation date
8/8/2014 7:26:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/7/2014
Doc Name
Weekly CQA Report: Week ending 07/26/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF)& HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125N0 <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: July 26, 2014 <br /> Location: Cripple Creek&Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 07.20.2014 through 07.26.2014 <br /> Days S M T I W T F S <br /> D D ]ED D D D <br /> Work Shifts <br /> D=Day Shift N=Night Shift W:Weather day <br /> Ambient Temperature Ranges During Week i Weather Conditions During Week: <br /> Highs. 71°F to 77°F Cloud Cover: Partly cloudy <br /> Lows: 42°F to 56°F <br /> Precipitation: Rain: Sun; Wed, Thurs. Fri, Sat. <br /> Wind: Variable <br /> Ames: Continu ng construction tasks for the Valley Leach Facility (VLF). <br /> Planning: Cont n,,ing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF(PSSA) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing, Chipping: None. <br /> Production Drilling: Production drilling was performed within the VLF limits. <br /> Production Blasting: One production blast occurred within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the technical <br /> specifications. <br /> A John Deere 850 excavator loaded Cat 777 haul trucks with shot rock froin the northeastern cut <br /> area of the PSSA below Bench B. Cat dozers were cutting material west of the Anaconda Mine <br /> Complex and from the Ball Mill crossing area. Material from these areas was transported to the <br /> ADR haul road fill between stations 60+00 to 65+00, 70+00 to 80+00, and upslope of stations <br /> J12+00 to J14+00 where it was placed as structural fill by Cat dozers. The cut within the PSSA <br /> footprint was completed on July 26. <br /> 2014.07.26rm,e2 weeky final Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.