Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 24 of 155 <br />BULLDOZER WORK <br />Task description: Regrade Old Shop Area at Empire Village <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 Permit/Job #: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 012 State <br />Date: 6/27/2014 County <br />User: JLE <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EOi <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />JIPMENT COST <br />Cat D10T - lOSU <br />574 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C044 -012 <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 13,090 <br />Utilization % <br />Ownership Cost/Hour: <br />$131.81 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL OUANTITIES <br />Initial Volume: 13,090 <br />Swell factor: 1.165 <br />Loose volume: 15,250 LCY <br />Source of estimated volume: <br />Table 63; Map 26 <br />Source of estimated swell <br />Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />150 feet <br />Unadjusted hourly <br />1,243.2 LCY/hr <br />production: <br />Materials consistency description: <br />Compacted fill or embankment 0.9 <br />Average push gradient: 5% <br />Average site altitude: 5,400 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />