My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-05_PERMIT FILE - P2014016
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014016
>
2014-08-05_PERMIT FILE - P2014016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 2:09:58 PM
Creation date
8/6/2014 3:23:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014016
IBM Index Class Name
Permit File
Doc Date
8/5/2014
Doc Name
New NOI- Exploration
From
Transit Mix Concrete
To
DRMS
Email Name
TAK
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> 9. The Board suggests that a photographic record of the pre-exploration and post-exploration conditions be kept by the <br /> explorer. "These photos should be taken from the same location and. by the same method to clearly show the <br /> pre-exploration condition of the land and the reclamation efforts. Upon completion of reclamation and request for bond <br /> or surety release,the Board shall consider the photos as evidence of adequate reclamation,and thus,be able to act more <br /> quickly on the request for release.* <br /> 10. TERMS AND CONDITIONS FOR EXPLORATION OPERATIONS: <br /> A. Reclamation measures shall be fulfilled in a timely manner. <br /> B. The.exploration.operations described.in.this Notice will.be conducted in such a manner as to minimize.surface. <br /> disturbances. In addition to the measures required in Rules 3.1 and 5.5.2,precautions to be taken include: <br /> I. Confinement of operations to areas near existing roads or traits,where practicable; <br /> 2. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry <br /> or flowing stream channel; <br /> 3. Timely abandonment of drill holes upon completion as required by Rule 5.4; <br /> C. It is the explorer's obligation to conduct the exploration operations in such a manner as to comply with all <br /> applicable state and federal air and water quality laws and regulations. <br /> D. The exploration operations shall be conducted so as to minimize adverse effects upon wildlife. <br /> E. During the exploration operations,the operator will perform the necessary stabilization and reclamation work to <br /> prevent significant alteration to the geomorphic processes at the site. <br /> F. All exploration operations shall be in compliance with the Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials,as amended,and any rules and regulations promulgated pursuant thereto. <br /> G. The Board shall determine(where there is a question)if an operation is exploration or mining. <br /> H. A financial warranty must be provided for the cost of reclamation of the disturbance described in this Notice. <br /> The explorer can either file a"One Site Exploration Financial Warranty"or a"Statewide Financial Warranty." <br /> Note: A One-Site Exploration Financial Warranty should be tiled in the amount of S2,000.00 per acre of land to be <br /> disturbed or such other amount as determined by the office,based on the proiected costs of reclamation.A statewide <br /> Financial Warranty must be posted in an amount determined by the Office. <br /> The explorer will post a surety in the arnount of 5,,,,,,,_„....._........._...._.._. <br /> The undersigned understands, accepts and agrees to comply with the foregoing terms and conditions and with ;.rll of the <br /> provisions of Rules 5 and 6. <br /> an A d 1A a <br /> zo 4- <br /> Si . ure of xploreri Alaimant Gate <br />
The URL can be used to link to this page
Your browser does not support the video tag.