Laserfiche WebLink
8/5/2014 State.co.us Executiw Branch Mail-RE:Hitch Rack Ranch <br /> STATE OF <br /> COLORADO Cazier - DNR, Tim <tim.cazier@state.co.us> <br /> RE: Hitch Rack Ranch 010.j�77./0 u 174 7V do r <br /> 1 message Q e-C, <br /> Jerald Schnabel <Jerald_Schnabel@transitmix.com> Fri, Aug 1, 2014 at 5:10 PM <br /> To: "Cazier- DNR, Tim" <tim.cazier@state.co.us> <br /> Tim <br /> The quote from DA Smith Drilling indicates: <br /> Drill HQ3 is a 3"diameter hole <br /> 8 ea. Total borings with an anticipated average depth of 150' <br /> 3"x 1200' If of boring <br /> 8 pad sites with 8 mud pits (1 mud pit each) <br /> Access will likely be on average 200' from existing ranch road by 12 feet wide total area of 2400sf <br /> I will discuss this next week at your convenience. <br /> Jerald Schnabel <br /> President <br /> Transit Mix Concrete CO. <br /> 444 East CostiIIa <br /> Colorado Springs CO 80903 <br /> 719-475-0700 <br /> From: Cazier - DNR, Tim [mailto:tim.cazier@state.co.us] <br /> Sent: Friday, August 01, 2014 4:34 PM <br /> https:Hmail.g oog le.com/mai I/u/O/?ui=2&i k=5fO9c8c280&vievw-pt&search=i nbox&th=14793d7448439716&si ml=14793d7448439716 1/4 <br />