Jerry Nettleton, MCM <br />Page 15 <br />August 6, 2014 <br />are included with these responses. It is MCM's understanding that the Division will utilize this <br />updated information to review and revise the reclamation cost estimate, and will provide the <br />revised estimate for MCM's review. Once the updated reclamation cost estimate is finalized, a <br />copy will be inserted in Exhibit 25. If the Division incorporates the relevant historical <br />information from the current cost estimate in this update, it will replace the current cost estimate <br />in Exhibit 25, otherwise, the current cost estimate will be retained as relevant historic <br />background, and the updated cost estimate will be added to Exhibit 25. <br />b) DRMS Response: The Division has reviewed the updated Table 56, Map 25 and the "Mine <br />Facilities" discussion in Section 2.05.3 of the PAP and identified several issues that will need to <br />be addressed. Please address the items below: <br />i) Please depict and label all of the rock dust tanks on Map 25. This should include the rock <br />dust tanks in the empire village, the two at the shop area and the one said to be located in the <br />No. 5A Portal. <br />ii) Either add more detail to Map 25 or create a separate map of the Coal Handling/Storage <br />Facilities listed on proposed revised page 2.05 -9. Some items are identified on the revised <br />map and others are not. Please clearly depict and label each of the items listed. <br />iii) Please depict and label the No. 5 and 5a Mine Fresh Water System and its components (Two <br />wells, water treatment system and No. 5 Mine Water Pump) on Map 25. <br />iv) Please depict and label the Red Rock Crusher site on Map 25. <br />v) Please depict and label all of the storage yards identified as "Ancillary Facilities ". <br />vi) Please add the 100,000 gallon water tank to revised Table 56. <br />The Division is conducting a reclamation cost estimate based on the revised information. Per our <br />discussion on Monday, the Division is forwarding this letter in advance of the estimate so you can begin <br />working on a response. I will forward the updated cost estimate as soon as it is completed. <br />The decision date for TR36 is September 12, 2014. If you need additional time to address the Division's <br />concerns please request an extension of the Decision date. If you have any questions feel free to contact <br />me. (303) 866 -3567, extension 8120. <br />Sincerely, <br />Jared Ebert <br />Environmental Protection Specialist <br />