Laserfiche WebLink
of.Co <br /> *7*. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> s�s * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> � <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHEET <br /> File No.: M- 1993-059 site Name: Midwestern Farms <br /> Count y P rowe rs TR# (DRMS Use onlx) <br /> Permittee: Midwestern Farms dba Eastern Colorado Aggregates <br /> Operator(If Other than Permittee): Same RECEIVED <br /> Permittee Representative: Leonard Read QU 0 44 !l14 <br /> Please provide a brief description of the proposed revision: DIVIM OF RECLAMATION <br /> Request that post mining use for the Colorado Parks &Wildlife pond be change rom general <br /> or flatter, using grass to reclaim entire area instead of planting trees and shrubs are also requested. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> I I Od, I I2d(I, 2 or 3) $1006 <br />