Laserfiche WebLink
Top View Goss Section <br /> Average temperature at each well m the process volume o�z. + ur•.wee.r n <br /> (cavern)decreased to 106F by end of March 2014. o s zo 15 za 71 <br /> No dissolution expected due to nahcolite saturated water in zuo I 1 <br /> the borehole. Wd t'♦1O' uw <br /> No water injection during this period. No Nahcolite removed o.u¢i n as <br /> (total nahcolite removed from start of project 112.4 tons). No < z z>so r4vme.d <br /> change in cavern dimensions after December 2013.Cavity a zzoo <br /> dimensions same as estimated by end of Q4 2013(elliptical ? d Zama <br /> shape of major axis 36.1 ft and minor axis 8.7 ft.Radius along t„ 3, :NO <br /> major axis 18.05 ft and 4.35 ft along minor axis). zzw n sect i <br /> See cross section inset for a vertical view of mined zone. zwo <br /> OWS _ <br /> Average temperature at leach well In the process volume <br /> (cavern)decreased to 105.5F.No injection in leach well.No <br /> No changes in cavity dimensions <br /> dissolution expected.Cavity dimensions as end of December <br /> 2013. <br /> June 2014 <br /> Average temperature at leach well in the process volume <br /> (cavern)decreased to 105F. No injection in leach well.No No changes in cavity dimensions <br /> dissolution expected.Cavity dimensions as end of December <br /> 2013. <br />