Laserfiche WebLink
July 28, 2014 C- 1996- 083 /Bowie No. 2 Mine SLB <br />observed in the drying area. <br />Although significant progress has been made with moving refuse stockpiled during the winter months, a <br />considerable amount of material requiring placement and compaction remains in the drying area. <br />Gob Pile 94 <br />Cover material was being place on Gob Pile #4, on the outslopes of the second and third benches. The material <br />that has been placed has resulted in the drainage break between ditches F20 and F12 being further west than the <br />currently approved design. Care should be taken to ensure that the drainage breaks are constructed as designed so <br />that the balance of flow between Ponds D and F is maintained as designed. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />PHOTOGRAPHS <br />tk 4 � ♦ i. fY� <br />'4 X �(. • i <br />�k��,i <br />t <br />IN— <br />w <br />... -. .:: yeI ,dnx <br />,..; ...s. �... i.�.i:� ... .._. ..Rtes `. ikf <br />Overview of Gob Piles #1, #2, #4, and soil storage of Gob Pile #3 <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 3 of 6 <br />