My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-01_REVISION - C1981014 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2014-08-01_REVISION - C1981014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:24 PM
Creation date
8/4/2014 10:11:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
8/1/2014
Doc Name
Letter & Application
From
Energy Fuels Coal, Inc
To
DRMS
Type & Sequence
MR64
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc. <br />southfield mine • post office box 459 • florence, colorado 81226 • (719) 784 -6395 <br />July 31, 2014 <br />Mr. Rob Zuber — Reclamation Specialist <br />Colorado Division of Reclamation Mining & Safety <br />1313 Sherman St — Room 215 <br />Denver, CO 80203 <br />BUG A Jp1k <br />lvis��'r R& Safi ty on, <br />°{ <br />RE: Minor Revision No.64 (MR -64) — Revise Text Concerning Annual Hydrology Reports <br />Energy Fuels Coal, Inc. (EFCI) — Permit No. C -81 -014 — Southfield Mine <br />Dear Rob Zuber: <br />if <br />Historically, concerning Annual Hydrology Reports, EFCI has always recorded and reported the <br />water year for the Southfield mine by tracking the calendar year (January — December). EFCI is uncertain <br />why the previous Technical Revision No. 35 (TR -35), submitted by the consulting firm Montgomery <br />Watson, indicated the water year as being June through May and the reporting due date as August 15t <br />This revision (MR -64) is to correct that discrepancy and verify that the water year for hydrology <br />reporting at the Southfield mine continues to track the calendar year, January through December and that <br />the due date for the annual reports is February 15 of each year following the previous water year. <br />To clarify the discrepancy in the narrative of TR -35, the year 2013 Annual Hydrology Report's <br />due date is August 1, 2014, but future Annual Hydrology Reports are due February 15 following the <br />previous water year. <br />If you have questions or require further information, please contact me. <br />Sincerely, <br />2� <br />George V Patterson <br />Energy Fuels Coal, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.