Laserfiche WebLink
III -24 Addressed Division's name change <br />III -25 Addressed Division's name change <br />III -26 III.A.8 Updated reference to mine ventilation shafts. <br />Addressed Division's name change. <br />Noted all return shafts sealed except RS -I IL. <br />III -34 III.D.1 Updated use of power for power line to SH -2 /13-Vent Shaft #2. <br />III -35 III.F Update mine rescue infrastructure to remove the B -Vent Shaft #2 <br />escape hoist /compressor /generator and identify the as -built <br />configuration of the breathable air supply at RDH -3. <br />Minor changes to rescue chamber discussion. <br />Section IV <br />IV -5 Addressed Division's name change <br />IV -12 Addressed Division's name change <br />IV -16 Addressed Division's name change <br />IV -17 Addressed Division's name change <br />IV -22 Addressed Division's name change <br />IV -41 Addressed Division's name change <br />IV -53 Addressed Division's name change <br />Section V <br />V -18 VX Addressed Division's name change <br />Updated Return Shaft plugging procedures noting that cuttings are <br />left on site to backfill holes. <br />V -22 Addressed Division's name change <br />V -23 Addressed Division's name change <br />V -25 Addressed Division's name change <br />V -26 Added footnote to Table V -4 addressing SAE soil piles <br />