Laserfiche WebLink
-4- <br /> 12. Primary future(Post-mining)land use(check one): <br /> Cropland(CR) F. Pastureland(PL) F. General Agriculture(GA) <br /> _ Rangeland(RL) Forestry(FR) _ Wildlife Habitat(WL) <br /> Residential(RS) . Recreation(RC) _ Industrial/Commercial(IC) <br /> Developed Water Resources(WR) _ Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one): <br /> _ Cropland(CR) _[;� Pastureland(PL) _ General Agriculture(GA) <br /> Rangeland(RL) L Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) I—_ Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Track Hoe's and front end loaders remove material and load into off road haul truck for deliver to plant. <br /> 15. On Site Processing: ✓ Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): Material is loaded in truck and delivered to Processing <br /> Plant inhere mnterinl is crushed and rcroonPd and stockpiled <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> None <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br />