Laserfiche WebLink
DEMOLITION WORK <br /> Task description: Demolition and disposal of structures <br /> Site: Hopemore Shaft Permit Action: New app Permit/Job#: M2013026 <br /> PROJECT IDENTIFICATION <br /> Task#: OlA State: Colorado Abbreviation: None <br /> Date: 7/23/2014 County: Lake Filename: M026-01 a <br /> User: DMC <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 89.00 % <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> Hopemore shaft 18'x 24'x 12' Bldg. (MN)demo./on- 5,184.00 CF $0.23 $1,171.58 <br /> building- site disposal in excavated <br /> superstructure pit-Max. 10,000 ft. haul <br /> Hopemore shaft 18'x 24' Demo.and on-site 432.00 SF $3.43 $1,481.76 <br /> building-concrete disposal in existing pit, <br /> floor 12 in.thick-Max.200 <br /> ft.push <br /> Hopemore hoist 24'x 36'x 12' Bldg. (SN)demo./on-site 10,368.00 CF $0.20 $2,083.97 <br /> building and shop disposal in excavated pit <br /> -Max. 10,000 ft.haul <br /> Hopemore hoist 24'x 36' Demo. and on-site 864.00 SF $3.43 $2,963.52 <br /> building and shop- disposal in existing pit, <br /> concrete floor 12 in.thick-Max.200 <br /> ft.push <br /> Compressor room- 32'x 10'x 12' Bldg.(SN)demo./on-site 3,840.00 CF $0.20 $771.84 <br /> superstructure disposal in excavated pit <br /> -Max. 10,000 ft.haul <br /> Compressor room- 32'x 10' Demo.and on-site 320.00 SF $3.43 $1,097.60 <br /> concrete floor disposal in existing pit, <br /> 12 in. thick-Max.200 <br /> ft.push <br /> Water tank building 10'x 10'x 10' Bldg. (SN)demo./on-site 1,000.00 CF $0.20 $201.00 <br /> disposal in excavated pit <br /> -Max. 10,000 ft.haul <br /> Hunter Hoist Room 12'x 18'x 12' Bldg. (SN)demo./on-site 2,592.00 CF $0.20 $520.99 <br /> disposal in excavated pit <br /> -Max. 10,000 ft,haul <br /> Hunter concrete floor 12'x 18' Demo.and on-site 216.00 SF $3.43 $740.88 <br /> disposal in existing pit, <br /> 12 in.thick-Max. 200 <br /> ft.push <br /> Hunter shaft house 24'x 22'x 15' Bldg. (SN)demo./on-site 7,920.00 CF $0.20 $1,591.92 <br /> disposal in excavated pit <br /> -Max. 10,000 ft.haul <br /> Hunter shaft-concrete 24'x 22' Demo.and on-site 528.00 SF $3.43 $1,811.04 <br /> floor disposal in existing pit, <br /> 12 in. thick-Max.200 <br /> ft.push <br /> Generator shed 9'x 12'x 12' Bldg.(SN)demo./on-site 1,296.00 CF $0.20 $260.50 <br /> disposal in excavated pit <br /> -Max. 10,000 ft.haul <br /> Dump fees for 1,193 c.y. Load/haul/dump 1,193.00 CY $2.04 $2,433.72 <br /> demolished structures demolished <br /> materials/debris into pit- <br />