Laserfiche WebLink
Mobilization Worksheet Cont'd Task#05A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: LEADVILLE <br /> Total one-way travel distance: 5.00 miles <br /> Average Travel Speed: 25.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: $2,529.91 <br /> Total Roadable Mob/Demob Cost** $6.12 <br /> ** one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.20 0.20 <br /> Return Time(Hours): 0.20 0.20 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.40 0.40 <br /> JOB TIME AND COST <br /> Total job time: 2.80 Hours <br /> Total job cost: $2,536 <br /> CIRCES Cost Estimating Software <br />