My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-08_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-07-08_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:32 PM
Creation date
8/1/2014 10:02:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/8/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />The Operator developed main entries (1 West Mains) under Terror Creek <br />during 2010 in order to access the coal reserves to the west. On September <br />20, 2010 the DRMS approved and incidental permit boundary revision <br />through TR -68. This 80 acre permit boundary expansion allowed the <br />Operator to begin developing mains, headgate entries and tailgate entries <br />west of Terror Creek. <br />The coal reserves located west of Terror Creek are referred to as the <br />western mining district. Longwall panels in the western mining district are <br />numbered B -10 through B -20. The western mining district will require a new <br />ventilation shaft and three or more gob vent bore holes per panel. Permit <br />Revision No. 12 (PR -12) gave the Operator approval to develop and mine in <br />the western mining district west of Terror Creek. <br />The Operator expanded the western mining district to the north as shown on <br />Map 14B and has acquired two lease modifications so it can mine four <br />additional longwall panels. Technical revision 71 allowed north mains and <br />gate road development within the approved permit boundary. Permit revision <br />13 expands the permit boundary to encompass the two lease modification <br />areas and four longwall panels (1317, B18, 1319 and B20). The longwall <br />panels located west of panel 14 were rotated 90 degrees. Two east west <br />oriented longwall panels replace four north south panels in the area. <br />During 2009 the Operator washed coal for West Elk Coal Company, <br />(WECC). WECC hauled raw E -Seam coal to BRL's lower stockpile area. <br />The Operator ran WECC's coal through the preparation plant. WECC <br />delivered 521,625 tons of raw coal to the Operator's lower stockpile area. <br />The Operator washed this coal producing 351,601 tons of clean coal. The <br />waste material generated was hauled back to WECC's disposal area by a <br />WECC contractor. The Operator loaded and shipped 351,601 tons of clean <br />coal for WECC. This process took place from January 14, 2009 through <br />September 13, 2009. <br />The following table shows the major equipment to be used in the mine and <br />on the surface. <br />PR -13 2.05-8- 08129/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.