Laserfiche WebLink
PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TEST RESULTS <br />PROJECT NO: M 14039MT <br />ENGINEERING TECHNICIAN: Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Friday, May /23/14 <br />Tuesday, May 27/14 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />PROJECT NUMBER: M14039MT <br />'PEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />(IN) <br />LABORATORY <br />PROCTOR <br />DENSITY <br />(PCF) <br />OPTIMUM <br />MOISTURE <br />CONTENT <br />( %) <br />DRY <br />DENSITY <br />(PCF) <br />MOISTURE <br />CONTENT <br />RELATIVE <br />COMPACTION <br />SOIL TYPE <br />Friday, May 23, 2014 <br />4 <br />RPEE -01 <br />8 <br />105.5 <br />11.0 <br />103.6 <br />17.6 <br />99 <br />Coal gob, black <br />5 <br />RPEE -02 <br />8 <br />105.5 <br />11.0 <br />103.2 <br />13.6 <br />98 <br />11 " <br />6 <br />RPEE -03 <br />8 <br />105.5 <br />11.0 <br />98.3 <br />11.0 <br />94 <br />7 <br />Haul road, south of the gob <br />8 <br />115.0 <br />14.0 <br />122.1 <br />9.6 <br />100 <br />Clay, sand, gravelly, <br />pile, east end <br />brown <br />8 <br />Haul road, south of the gob <br />8 <br />115.0 <br />14.0 <br />111.1 <br />13.6 <br />97 <br />" <br />pile, west end <br />Tuesday, May 27/2014 <br />9 <br />RPEE -01 <br />8 <br />105.5 <br />11.0 <br />101.7 <br />16.3 <br />97 <br />Coal gob, black <br />10 <br />RPEE -02 <br />8 <br />105.5 <br />11.0 <br />100.0 <br />14.9 <br />95 <br />" " <br />11 <br />RPEE -03 <br />8 <br />105.5 <br />11.0 <br />101.7 <br />15.6 <br />97 <br />REMARKS: The test results indicate only the density and moisture content for the location and elevation tested only. <br />PROJECT NUMBER: M14039MT <br />