Laserfiche WebLink
PROJECT: RPEE <br />LOCATION: Somerset <br />CLIENT: Mountain Coal Company <br />RELATIVE COMPACTION TFST RESULTS <br />PROJECT NO: M14039MT <br />ENGINEERING TECHNICIAN: Hayes <br />NUCLEAR GAUGE USED: 18 <br />DATE: Thursday, June /19114 <br />REMARKS: The test results indicate Only the ctenslty ana moisture content for tnc a MIL)II anu ctcvuuUu 1vDLcu V111y. <br />I <br />PROJECT NUMBER: N114039M7' <br />TEST LOCATION <br />DEPTH OR <br />ELEVATION <br />PROBE <br />DEPTH <br />(IN) <br />LABORATORY <br />PROCTOR <br />DENSITY <br />(PCF) <br />OPTIMUM <br />MOISTURE <br />CONTENT <br />( %) <br />DRY <br />DENSITY <br />(PCF) <br />MOISTURE <br />CONTENT <br />( °!o) <br />RELATIVE <br />COMPACTION <br />( %) <br />SOIL TYPE <br />19 <br />RPEE -01 <br />8 <br />105.5 <br />11.0 <br />104.2 <br />13.0 <br />99 <br />Coal gob, black <br />20 <br />RPEE -02 <br />8 <br />105.5 <br />11.0 <br />99.6 <br />11.7 <br />95 <br />" <br />21 <br />RPEE -03 <br />8 <br />105.5 <br />11.0 <br />100.5 <br />116 <br />96 <br />" <br />22 <br />On the haul road, just before <br />2nd lift <br />8 <br />105.5 <br />11.0 <br />96.4 <br />16.9 <br />92 <br />" <br />the gob pile, south end <br />23 <br />On the haul road, just before <br />8 <br />105.5 <br />11.0 <br />102.6 <br />5.0 <br />98 <br />" <br />the gob pile, north end <br />{ <br />REMARKS: The test results indicate Only the ctenslty ana moisture content for tnc a MIL)II anu ctcvuuUu 1vDLcu V111y. <br />I <br />PROJECT NUMBER: N114039M7' <br />