My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-28_PERMIT FILE - P2014014 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014014
>
2014-07-28_PERMIT FILE - P2014014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 5:18:31 AM
Creation date
7/30/2014 1:49:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014014
IBM Index Class Name
Permit File
Doc Date
7/28/2014
Doc Name
New NOI- Form 2
From
Natural Soda Holdings, Inc.
To
DRMS
Email Name
GRM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (FORM 2 -Public filing) <br /> 11. Describe proposed surface excavation or other land disturbance,including roads,pits,trenches,waste piles,drill pads and <br /> collar areas of underground workings,ponds,etc... <br /> Please see attached Exhibit C - "Supplemental Information", Section III "Project Description", <br /> Item No. 5 <br /> 12. Proposed Disturbance(approximate)Describe the proposed drilling to be conducted,including anticipated number of holes, <br /> diameter,depth,location,etc... Submit additional pages if necessary: <br /> A. Drill Pads: Quantity 1.00 Average Width 250.00 (ft)Average Length 433.00 (ft) See Attached Exhibit C- <br /> 1.00 2,897.00 19.00 "Supplemental Information", <br /> B. Drill Holes: Quantity Depth (ft) Diameter (in)Section III"Project <br /> C. Mud Pits: Quantity 1.00 Average Width 12.00 (ft)Average Length 60.00 (ft) Description", Item No.6.A <br /> and Item No.6.6 <br /> Average Depth 10.00 (ft) <br /> Described proposed underground work,including reopening of old workings,advancement of adits or shafts, <br /> trenches,pits,cuts,rock dumps,or other types of disturbance,describe type,quantity and general dimensions: <br /> Please see attached Exhibit C - "Supplemental Information", Section III "Project <br /> Description", Item No. 6.C. <br /> F. Other Disturbances(please describe): <br /> No other additional disturbances are anticipated. <br /> G. Indicate Chemicals and Fuels used or stored on site. List type,quantity and method to store. <br /> Drilling mud will be a bentonite-based fluid with polymer(Pol-E-Flake), contained by mud pit. Therminol 66: an <br /> oil based heat transfer medium used in retort process, quantity unknown at this time, stored in closed loop well <br /> tubing and tank. Produced nahcolite brine, quantity unknown at this time,will be recovered and stored in tank. <br /> Produced liquid and gaseous hydrocarbons, 100 barrels, will be stored in tanks. (See Supplemental <br /> Information, Item No. 6.E., and Table 1 for tank descriptions and volumes.) <br /> F. New Road(s): Length 445.00 (ft)Width 20.00 (ft) <br /> Significantly Upgraded Road(s) Length (ft)Width (ft) <br /> Are culverts or other crossings proposed? If so,please describe: <br /> No culverts or crossings are proposed to be installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.