My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-07_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-07-07_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:29 PM
Creation date
7/30/2014 10:32:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/7/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task # TTT <br />BULLDOZER WORK <br />Task description: Regrade GVB /exploration hole pads and roads <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 90 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 363 <br />Date: 6/18/2014 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost /Hour: <br />Total Fleet Cost /Hour: <br />$253.73 <br />$253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,107 <br />Swell factor: 1.165 <br />Loose volume: 9,445 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />DRMS - assume 1.5' material 3.35 ac (2.0 pad /1.35 road) <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Page 5 of 10 <br />Abbreviation: None <br />Filename: C083 -363 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />Utilization % <br />Ownership Cost /Hour: <br />$72.57 <br />1.000 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />(GEN.) <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost /Hour: <br />Total Fleet Cost /Hour: <br />$253.73 <br />$253.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 8,107 <br />Swell factor: 1.165 <br />Loose volume: 9,445 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />DRMS - assume 1.5' material 3.35 ac (2.0 pad /1.35 road) <br />Cat Handbook <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 20% <br />Average site altitude: 7,725 feet <br />Material weight: 2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Page 5 of 10 <br />Abbreviation: None <br />Filename: C083 -363 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.