My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-07_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-07-07_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:29 PM
Creation date
7/30/2014 10:31:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/7/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Bowie -2 MR -123 approved six gob vent holes to be drilled in 2011. They <br />are GVB -B11A, B11 B, 1312A, 131213, B12C & 1313A. MR -124 approved <br />two additional holes to be drilled in 2011. They are GVB -B11C and B12D. <br />GVB -B12A, B12B, B12C & B13A were drilled in 2012. <br />Bowie -2 TR -73 approved ten gob vent holes and three exploration holes. <br />They are GVB -B1 2E, GVB -B1313, GVB -B1 3C, GVB- B1 3D,GVB -B13E, <br />GVB -B14A, GVB -B14B, GVB -B14C, GVB -B14D, GVB -B14E, SS -6 <br />SS -7 and 2012 -1. GVB -B12E, GVB -B13B, GVB -B13C, GVB- B13D,GVB- <br />B13E, GVB -B14A, SS -7 and 2012 -1 were drilled in 2012. The remaining <br />holes were drilled in 2013. <br />Bowie -2 MR -133 approved the 2012 installation of four utility holes to be <br />installed north of the large ventilation fan above the D -Seam portals. MR- <br />133 also approved the 2012 installation of GVB -13F. <br />Bowie -2 MR -134 approved the installation of an emergency vent hole into <br />the B13 tailgate bleeder entry. Due to technical difficulties this vent hole <br />was not installed. The drill pad for the emergency hole was constructed. <br />Bowie -2 MR -135 approved the 2013 installation of an emergency gob <br />vent hole for the B13 panel (GVB- B1 3C -1). <br />Bowie -2 TR -78 approved the 2013 installation of six gob vent holes and <br />one exploration hole. They are GVB -B14F, GVB -B15A and exploration <br />hole SS -8. GVB -B15B, GVB -B15C, GVB -B15D, GVB -B16A will be drilled <br />in 2014. <br />Bowie -2 MR -146 approved the installation of 4,300 feet of 6 inch diameter <br />schedule 80 HDPE pipe adjacent to the existing Pitkin Mesa pipeline. The <br />new pipeline will be located over longwall panels B -15 and B -16. <br />Bowie -2 TR -86 approved the 2014 installation of ten gob vent holes and <br />three exploration holes. They are GVB -B16B, GVB -B16C, GVB -B16D, <br />GVB -B17A, GVB -B17B, GVB -B17C, GVB -B17D, GVB -B17E, GVB -B19A, <br />GVB -B19B and exploration holes 2014 -SS -A, 2014 -SS -B and 2014 -SS -C. <br />Bowie -2 MR -152 approved moving eleven gob vent holes. The 15, 16, <br />17, 18 and 19 series holes were moved. <br />Bowie -2 TR -90 approved the 2014 and 2015 installation of two gob vent <br />holes GVB -B17F & B19C. TR -89 also relocates GVB -B15A. <br />TR -90 2.05-49- 06/13/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.