Laserfiche WebLink
Page 33 of 80 <br />Material consistency: 0.900 (CAT HB)) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br /> <br />Net correction: 0.3209 <br /> <br /> <br />Adjusted unit production: 273.60 LCY/hr <br /> <br />273.6 <br />Adjusted fleet production: LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.794/LCY <br /> <br />Total job time: 0.75 Hours <br />Total job cost: $162 <br />BULLDOZER WORK <br /> <br />Task description: Regrade South Run-Off Diversion Ditch <br /> <br />Site: Northfield Mine Permit Action: 2014 Updated Costs Permit/Job#: C2006085 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 039 State: Colorado Abbreviation: None <br />Date: 7/25/2014 County: Fremont Filename: C085-039 <br />User: JHB <br /> <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br /> <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $69.05 NA <br />Operating Cost/Hour: $108.22 100 <br />Ripper op. Cost/Hour: $1.86 25 <br />Operator Cost/Hour: $38.01 <br />NA <br /> <br />Total unit Cost/Hour: $217.14 <br />Total Fleet Cost/Hour: $217.14 <br /> <br />MATERIAL QUANTITIES <br /> <br /> <br />CIRCES Cost Estimating Software <br />