My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-29_PERMIT FILE - C2006085
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2014-07-29_PERMIT FILE - C2006085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:09 PM
Creation date
7/30/2014 10:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
7/29/2014
Doc Name
Updated Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11 of 80 <br /> <br />COMPACTION WORK <br /> <br />Task description: Compact Mine Waste and Coal Stockpile Footprints at Mine Was <br /> <br />Site: Northfield Mine Permit Action: 2014 Updated Costs Permit/Job#: C2006085 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 008 State: Colorado Abbreviation: None <br />Date: 7/28/2014 County: Fremont Filename: C085-008 <br />User: JHB <br /> <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Basic Machine: CAT 815F Horsepower: 240 <br />Compactor Type: Soil - tamping foot Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> <br /> <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $36.81 NA <br />Operating Cost/Hour: $82.25 100 <br />Operator Cost/Hour: $28.75 NA <br /> <br />Total Unit Cost/Hour: $147.81 <br /> <br />Total Fleet Cost/Hour: $147.81 <br /> <br />MATERIAL QUANTITIES <br /> <br />Loose volume: 15,000 LCY Shrinkage factor: 0.900 <br />Compacted volume: 13,500 CCY <br /> <br />Source of estimated volume: Division Estimate <br />Source of estimated shrinkage factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> <br />Unadjusted hourly production = (W x S x L x C) / P <br /> <br />Compacted width per pass (W): 6.50 feet <br />Average Compactor Speed (S): 3.00 mph <br />Compacted thickness of each lift (L): 8.00 inches <br />Conversion Constant (C): 16.3 (5,280ft./12in./27cu.ft.) <br />Required number of machine passes (P): 4 passes <br />Unadjusted Hourly Unit Production: 635.70 CCY/hour <br /> <br />Job Condition Correction Factors Site Altitude: 5,400 feet <br /> <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br /> <br />Adjusted Hourly Unit Production: 527.63 CCY/Hour <br />Adjusted Hourly Fleet Production: 527.63 CCY/Hour <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Compactor(s) Total job time: 25.59 Hours <br /> <br />Unit cost: $0.280 per CCY Total job cost: $3,782 <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.