Laserfiche WebLink
Page 4 of 81 <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 0.786 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.793 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br /> <br />Net correction: 0.2794 <br /> <br /> <br />Adjusted unit production: 195.58 LCY/hr <br /> <br />195.58 <br />Adjusted fleet production: LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $1.297/LCY <br /> <br />Total job time: 227.54 Hours <br />Total job cost: $57,736 <br /> <br /> <br /> <br />CIRCES Cost Estimating Software <br />