Laserfiche WebLink
Task # 028 Page 3 of 3 <br /> <br />Haul Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 6800.00 3.00 1.20 4.20 2051 3.582 <br />2 10000.00 -2.00 1.20 -0.80 3893 2.648 <br /> <br />Haul Time: 6.230 minutes <br />Return Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 10000.00 2.00 1.20 3.20 4074 2.814 <br />2 6800.00 -3.00 1.20 -1.80 4254 1.648 <br /> <br />Return Time: 4.462 minutes <br />Total Truck Cycle Time: 13.892 minutes <br /> <br />Loading Tool unit <br />Production 715.91 LCY/Hour Adjusted for job efficiency: 594.20 LCY/Hour <br />Truck Unit Production <br />113.37 LCY/Hour Adjusted for job efficiency: 94.10 LCY/Hour <br /> <br />Optimal No. of Trucks: 6 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> <br />Adjusted hourly truck team production: 376.40 LCY/Hour <br />Adjusted single truck/loader team production: 376.40 LCY/Hour <br />Adjusted multiple truck/loader team production: 376.40 LCY/Hour <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Team(s) Total job time: 128.41Hours <br /> <br /> <br />Unit cost: $2.118 /LCY Total job cost: $102,388 <br /> <br /> <br />CIRCES Cost Estimating Software <br />