Laserfiche WebLink
a <br />Ames continued placing low volume solution collection fill (LVSCF) on approved secondary liner <br />in minimum 3 -foot lifts between panels S10 and S11, S34 to S59, S69 to S70, S152 to S155, and <br />S134 to S164 with a Cat D6 GPS wide pad dozer and a Cat D8 wide pad dozer. <br />A Cat Skidsteer tapered the LVSCF grade on the 9450' bench between panels S -1 through S -41. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; underground working remediation and confirmatory drilling. <br />11) Laboratory Activities: Permeability laboratory testing continued and concrete cylinders were cast for <br />compressive strength testing from underground working #6318. <br />No new earthwork material sampling occurred during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: Weekly Contractor Meeting — July 17, 2014 (CC &V, AMEC, Ames); ECA <br />daily safety meetings; and Ames daily safety meetings. <br />Summary of Concerns: None <br />CC&V: Daily updates; reporting and scheduling are some of the tasks occurring between CC &V Projects <br />AMEC. and Ames. <br />Miscellaneous: <br />Drain cover fill crusher processing continued <br />Highway 67 drainage ditch construction <br />Deliveries: ECA received 36 rolls of 80 -mil DSMS geomembrane for Phase 1 <br />Submitted by: Eric Lorenson <br />Reviewed by: <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />Projects <br />Approved By <br />Approved By. <br />Date: July 21, 2014 <br />Date: July 21, 2014 <br />Date: --)/-Z:3 1,4 <br />Date: <br />2014.07.19 -MLE2 WEEKLY FINAL Page 3of6 <br />