My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-07-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:06 PM
Creation date
7/29/2014 1:50:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/28/2014
Doc Name
Weekly construction quality assurance report week ending 7/5/14, 7/12/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />Ames continued placing low volume solution collection fill (LVSCF) on approved secondary liner <br />in minimum 3 -foot lifts between panels S10 and S11, S34 to S59, S69 to S70, S152 to S155, and <br />S134 to S164 with a Cat D6 GPS wide pad dozer and a Cat D8 wide pad dozer. <br />A Cat Skidsteer tapered the LVSCF grade on the 9450' bench between panels S -1 through S -41. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; underground working remediation and confirmatory drilling. <br />11) Laboratory Activities: Permeability laboratory testing continued and concrete cylinders were cast for <br />compressive strength testing from underground working #6318. <br />No new earthwork material sampling occurred during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: Weekly Contractor Meeting — July 17, 2014 (CC &V, AMEC, Ames); ECA <br />daily safety meetings; and Ames daily safety meetings. <br />Summary of Concerns: None <br />CC&V: Daily updates; reporting and scheduling are some of the tasks occurring between CC &V Projects <br />AMEC. and Ames. <br />Miscellaneous: <br />Drain cover fill crusher processing continued <br />Highway 67 drainage ditch construction <br />Deliveries: ECA received 36 rolls of 80 -mil DSMS geomembrane for Phase 1 <br />Submitted by: Eric Lorenson <br />Reviewed by: <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />Projects <br />Approved By <br />Approved By. <br />Date: July 21, 2014 <br />Date: July 21, 2014 <br />Date: --)/-Z:3 1,4 <br />Date: <br />2014.07.19 -MLE2 WEEKLY FINAL Page 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.