My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-07-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:06 PM
Creation date
7/29/2014 1:50:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/28/2014
Doc Name
Weekly construction quality assurance report week ending 7/5/14, 7/12/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) <br />SQUAW GULCH (VLF) & HWY 67 RE- ALIGNMENT MONITORING WEEKLY REPORT <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: July 19, 2014 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 07.12.2014 through 07.19.2014 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />D =Day Shift N =Night Shift W= Weather day <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 68 °F to 72 °F Cloud Cover: Partly cloudy <br />Lows: 41 °F to 47 °F Precipitation: Rain - Mon, Tues, Wed, Thurs, Fri, <br />Sat. <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA) <br />Topsoil /Overburden Stripping: None, <br />Tree Grubbing and Clearing, Chipping: None. <br />Production Drilling: Production drilling was performed within the VLF limits. <br />Production Blasting: One production blast occurred within the VLF. <br />Structural Fill: <br />All structural fill material discussed below was placed and compacted per the technical <br />specifications. <br />A John Deere 850 excavator loaded Cat 777 haul trucks with shot rock from the northeastern cut <br />area of the PSSA below Bench B. Cat dozers were cutting material from the Anaconda Mine <br />Complex and from the Ball Mill crossing area. Material from these areas was transported to the <br />ADR haul road fill between STA 58 +00 to 75 +00 and upslope of stations J11 +00 to J12 +00 where <br />it was placed as structural fill by Cat dozers. <br />Cat dozers were finish grading between Bench DD and Bench FF and the east perimeter road. A <br />Cat vibratory roller compacted the subgrade according to project specifications. <br />2014.07.19 -mle2 weekly final Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.