amec* <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLUGULD ASHANT"I (COLORADO) <br />SQUAW GULCH (VLF) & HWY 67 RE- ALIGNMENT MONITORING WEEKLY REPORT <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: 74201125NO <br />Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: July 5, 2014 <br />Location: Cripple Creek & Victor Gold Mine, CO <br />Contractor: Ames Construction, Inc. <br />Reporting Period: 06.20.2014 through 07.05.2014 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: _ <br />Highs: 80 °F to 62 °F Cloud Cover: Partly cloudy <br />Lows: 41 °F to 52 °F Precipitation: Afternoon rain, TueS & Thurs <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA) <br />Topsoil/Overburden Stripping: Cat dozers stripped topsoil below the abandoned historic <br />railroad berm east of the Phase 2 pond. The material was hauled to the Area 34 topsoil stockpile. <br />Tree Grubbing and Clearing, Chipping: <br />None. <br />Production Drilling: Production drilling was performed within the VLF limits. <br />Production Blasting: One production blast occurred within the VLF. <br />Structural Fill: <br />All structural fill material discussed below was placed and compacted per the technical <br />specifications. <br />A John Deere 850 excavator loaded Cat 777 haul trucks with shot rock from the northeastern cut <br />area of the PSSA below Bench B. Cat dozers were cutting material from the Ball Mill crossing. <br />Material from these areas was transported to the ADR haul road fill between STA 20 +00 to <br />25 +00, STA 65 +00 and 70+00, and to the fill area between Bench D and Bench H where it was <br />placed as structural fill by Cat dozers. <br />2014.07.05 -mle2 weekly final Page 1 of 7 <br />Days I S I_M IT W T F S <br />- <br />Work Shifts - <br />D =Day Shift N =Night Shift W =Weather day <br />Ambient Temperature Ranges During Week Weather Conditions During Week: _ <br />Highs: 80 °F to 62 °F Cloud Cover: Partly cloudy <br />Lows: 41 °F to 52 °F Precipitation: Afternoon rain, TueS & Thurs <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning: Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA) <br />Topsoil/Overburden Stripping: Cat dozers stripped topsoil below the abandoned historic <br />railroad berm east of the Phase 2 pond. The material was hauled to the Area 34 topsoil stockpile. <br />Tree Grubbing and Clearing, Chipping: <br />None. <br />Production Drilling: Production drilling was performed within the VLF limits. <br />Production Blasting: One production blast occurred within the VLF. <br />Structural Fill: <br />All structural fill material discussed below was placed and compacted per the technical <br />specifications. <br />A John Deere 850 excavator loaded Cat 777 haul trucks with shot rock from the northeastern cut <br />area of the PSSA below Bench B. Cat dozers were cutting material from the Ball Mill crossing. <br />Material from these areas was transported to the ADR haul road fill between STA 20 +00 to <br />25 +00, STA 65 +00 and 70+00, and to the fill area between Bench D and Bench H where it was <br />placed as structural fill by Cat dozers. <br />2014.07.05 -mle2 weekly final Page 1 of 7 <br />