CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; underground working remediation and confirmatory drilling and blasting; <br />production drilling and blasting; SLF moisture content and density testing; sampling and testing of <br />Drain Cover Fill (DCF) for QC, sampling and testing of Soil Liner Fill (SLF) material for QA; sampling <br />and testing of Low Volume Solution Collection Fill ( LVSCF) material for QA; and sampling and testing <br />of Structural Fill (SF) material for QA and QC; subgrade surface certification in the PSSA and the <br />Phase 1 east slope; and SLF surface inspection and certification. <br />II) Laboratory Activities: Laboratory testing continued with permeability, particle size distribution, <br />Atterberg limits, moisture- density relationships, gradations, material classification, and field material <br />sampling were performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />➢ Drain Cover Fill sample numbers; DCF -97 and 98 (control sample). <br />Y Soil Liner Fill sample number, SLF -16 -R (record sample). <br />Y Low Volume Solution Collection Fill, LVSCF 1 -R, 2 -R and 3 -R (record samples). <br />➢ Structural Fill sample numbers, SF 90 -R, 91 -R and 92 -R (record samples). <br />General Proiect Items <br />Meetings and Discussions: Weekly Contractor Meeting — July 9, 2014 (CC &V, AMEC, Ames); CC &V <br />Weekly Safety Professional Meeting — July 10, 2014; ECA daily safety meetings; and Ames daily safety <br />meetings. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, <br />AMEC, and Ames. <br />Miscellaneous: <br />;,, Drain cover fill crusher processing continued <br />➢ Riprap screen processing continued <br />Soil liner fill placed at the PSSA was moisture conditioned <br />Highway 67 drainage ditch construction <br />);- Seeding and mulching the Area 34 topsoil stockpile <br />Deliveries: ECA received 8 rolls of 80 -mil DSMS and 4 rolls of 100 -mil LLDPE smooth geomembrane. <br />Submitted by: Date: July 15, 2014 <br />Bobby Redd; El <br />Reviewed <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Approved By: / <br />Approved B <br />r / / <br />Date: July 15. 2014 <br />Date: 7 //,p // `-,< <br />Date: ! — / r--/ L� - -- <br />2014.07.12 -mle2 weekly final Page 4 of 7 <br />