Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Very little, If any top soil is present. The area is covered largely with a thin 6 -8 inch layer of <br />overburden. Where top sail is present it will be stacked plied every 20 yards. After <br />GOMpletiOR Gf the PFGjeGt, existing top will be reseededd aIGRg with any additieRal top sow! <br />required. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />No drilling will be done <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Trench will be backfilled with waste rock and overburden. Then backfill will be covered <br />with a layei of seeded top suil. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />The road is currently closed using a series of small, dirt berms. The dirt moved in order to <br />re open the road will be placed on the side and reused in the same locations currently <br />existing. <br />