Laserfiche WebLink
', � <br />�1 <br />RECEIVED <br />Other Reclamation Permits held by Prospective Successor (if applicable): <br />JU( 21 2014 <br />/ 2 0 l3' Division of Reclamation, <br />Mining & Safety <br />az o <br />DESIGNATION OF REVIEW TIMELINE <br />As explained above, the Permittee and Prospective Successor may waive their right to receive a <br />decision on an Application within 30 days in order to allow the Division to calculate the required <br />Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br />one of the following two options to designate their choice. If Permittee and Prospective <br />Successor cannot agree, the Division will render its decision within 30 days. <br />oPa" -1 <br />I have reviewed the information provided in this Application <br />Per�ijt�e Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br />Prospective Successor MY APPLICATION WITHIN 30 DAYS. <br />Q®P 6 ova 0-\ <br />c I have reviewed the information provided in this Application <br />Perini . e Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br />ON MY APPLICATION WITHIN 30 DAYS. <br />P�o=pec iMeSuccessor <br />The Prospective Successor must provide an adequate Financial Warranty or conditional <br />replacement Financial Warranty, consistent with the designation above. Hard Rock and <br />Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br />Each Financial Warranty must be submitted on the Board's approved forms (available online at <br />http://mininiz.state.co.us/Mineral%2OForms.htm). <br />