Laserfiche WebLink
Trapper Mine; C- 1981 -010; PR07 Cost Estimate <br />Task description: Ash Pit <br />Site: Trapper Mine <br />BULLDOZER WORK <br />ade; Cross Section 1/2 <br />Permit Action: PR07 <br />PROJECT IDENTIFICATION <br />Task #: A01 State <br />Date: 2/12/2014 County <br />User: JLE <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />APMENT COST <br />Cat DIIR - 11SU <br />850 <br />Semi - Universal <br />NA <br />3 per day <br />(CRG) <br />Page 1 of 270 <br />Permit /Job #: C1981010 <br />Abbreviation: None <br />Filename: C010 -A01 <br />Total unit Cost/Hour: $384.75 <br />Total Fleet Cost/Hour: $1,539.02 <br />MATERIAL QUANTITIES <br />Initial Volume: 28,832 <br />Swell factor: 1.000 <br />Loose volume: 28,832 LCY <br />Source of estimated volume: Appx. A Table A -4.1; DRMS Weighted AVG Push Dist. <br />& Slope <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />430 feet <br />713.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />-30% <br />6,800 feet <br />2.475 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$66.17 <br />NA <br />Operating Cost/Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.66 <br />NA <br />Total unit Cost/Hour: $384.75 <br />Total Fleet Cost/Hour: $1,539.02 <br />MATERIAL QUANTITIES <br />Initial Volume: 28,832 <br />Swell factor: 1.000 <br />Loose volume: 28,832 LCY <br />Source of estimated volume: Appx. A Table A -4.1; DRMS Weighted AVG Push Dist. <br />& Slope <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />430 feet <br />713.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />-30% <br />6,800 feet <br />2.475 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Source <br />