My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-25_REPORT - M1981307
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981307
>
2014-07-25_REPORT - M1981307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 6:49:39 AM
Creation date
7/28/2014 7:20:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981307
IBM Index Class Name
REPORT
Doc Date
7/25/2014
Doc Name
Annual Fee/Report/Map
From
Martin Marietta Materials, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,.RECEIVED <br /> JUL 2 5 Z014 Page 2 of 3 <br /> DIVISION OF RECLAMATION, 112c Annual Report <br /> WNl G 8 ETY-MINERALS <br /> a artin Marietta Materials, Permit Number: M-1981-307 <br /> Inc. <br /> Operation Name: Fountain Pit County: El Paso <br /> Annual Fee Due: $791.00 Anniversary Date: June 15,2014 <br /> Permit Acreage: 605.00 Current Bond Amt: $1,369,462.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). &EE NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES g O <br /> b)approval for INTERMITTENT OPERATION? YES O <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). 13 <br /> 8. Number of acres that were newly affected during the current report year. 3`2 <br /> 9. Number of acres that were reclaimed during the current report year. D <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ O w/topsoil U mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application li <br /> graded: ] fertilized w/ G replacement U rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application — application application <br /> method: method: method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.