Laserfiche WebLink
7/25/2014 State.co.us Executive Branch Mail-RE:M-1995-008-Full Surety Release Request <br /> O STATE F <br /> STATE DO Cazier - DNR, Tim <tim.cazier@state.co.us> <br /> COLO <br /> RE: M-1995-008 - Full Surety Release Request i4R -o 1 <br /> 1 message <br /> Jordan Sasser <jordan@arycorp.com> F9E1s-7,v41 P.kvlw& �ne)q, -, x Fri, Jul 25, 2014 at 9:30 AM <br /> To: "Cazier- DNR, Tim" <tim.cazier@state.co.us> 0204 <br /> Ti m, <br /> Sorry for the misunderstanding. We are trying to get the partial release on phase 1 of the LA Methodist <br /> Pit. I am attaching pictures of the current work being don't to begin reclaiming phase 2. Please let me <br /> know if you need any other information. <br /> jor,�nv, Scisser <br /> ASS CDv,strL, ctiovL Co. <br /> Safety � Ev,vl rov vWtevt,tctL Coord�v�ator <br /> 719.275.1280 - o f face <br /> 719.429.2734 - Cell <br /> 719.275.8897 - Fax <br /> AW <br /> From: Cazier- DNR, Tim [mailto:tim.cazier@state.co.us] <br /> Sent:Thursday, July 24, 20148:13 AM <br /> To:jordansasser <br /> Cc:Angela Bellantoni <br /> Subject: M-1995-008- Full Surety Release Request <br /> Jordan, <br /> just received your Full/Final Release request for the Florence Pit (a.k.a. LA Methodist). I believe there is some <br /> confusion as my inspection report recommended requesting a release ONLY for the Phase 1 area. This would be <br /> the second box, "Acreage Reduction/Partial Release". Based on my June inspection, Phase 2 is not releasable, <br /> as final grading was being performed and there were some erosion rills on the north end. The DRMS would need <br /> vegetation to be established, as it is in the Phase 1 area for the full site to be released. <br /> https://mail.g oog le.corn/mai I/u/0/?ui=2&i Ir 5fO9c8c280&\ie\v-pt&search=i nbox&th=1476e2633Oa77215&si H=1476e2633Oa77215 1/3 <br />