Laserfiche WebLink
■%imv`e W iMv <br /> JUL 2 4 2014 Page 2 of <br /> DIVISION OF RECLAMATION, <br /> 112c Annual Report M Gi <br /> Wo <br /> ETY• ERALS <br /> E T MA W_ <br /> Permittee Name: Meeker Sand&Gravel, Permit Number: M-1976-038 <br /> Inc. <br /> Operation Name: Meeker Pit County: Rio Blanco <br /> Annual Fee Due: $791.00 Anniversary Date: July 25, 2014 <br /> Permit Acreage: 78.80 Current Bohd Amt: $150,316.90 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES 6D <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? -74i U aClb VC. <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br /> b)approval for INTERMITTENT OPERATION? YES NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). —�iL� �/L <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. 1� <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. O <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: /O fertilized w/ replacement rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: — method: method: <br />