Laserfiche WebLink
� %0"1 Y GLop <br /> C JUL 2 4 2014 Page 2 of <br /> Ci <br /> DIVISION OF RECLAMATION, <br /> 112c Annual Report ����ERALS <br /> IRS <br /> Permittee Name: Washington County Permit Number: M-1994-077 <br /> Operation Name: Nickell Gravel Pit County: Washington <br /> Annual Fee Due: $791.00 Anniversary Date: August 25, 2014 <br /> Permit Acreage: 67.95 Current Bond Amt: $0.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(l). ff NO <br /> J <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). Q0 NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? 3 <br /> rw <br /> 5. Does the mine operate more than 180 days per year � YES <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. 5 p <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES 0- <br /> b)approval for INTERMITTENT OPERATION? YES <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). J,- <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. d <br /> 10. Estimated new acreage to be affected in the next report year. y <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> D approved mix: U replaced: approved mulch: Q <br /> Total acres Total acres Topsoil Mulch application <br /> graded: C) fertilized w/ ,ram replacement O rate(tons): /7 <br /> apvd fertilizer: V depth(in.): V <br /> Seed Fertilizer ra <br /> ch <br /> application application ication <br /> method: method: hod: <br />