Laserfiche WebLink
backfilling will proceed to BF II and then BF III, BF IV, BF V, BF VI, BF VIII, BF IX, BF X, BF XI, and BF XII. The <br /> general plan is to have backfilling and reclamation occurring as closely behind quarrying as possible. <br /> While overburden is being removed from Mining Area A2, backfilling will be taking place in Back Fill Area <br /> BF II, from there backfilling will begin in BF IV and proceed east and then south as mining areas are <br /> depleted. Overall depths of overburden will vary but a minimum depth of two (2)feet will be <br /> maintained to provide a sufficient base for vegetation. <br /> Mining Area B, D <br /> Additional reserves within the permit boundary are outlined in Mining Areas B (possible reserves) and <br /> Mining Area D (probable reserves).These reserves will be evaluated and mined as previously mined <br /> acres are reclaimed and released from the Reclamation Board. <br /> Page 2-Owl Canyon 2013 Revision <br /> D-2 <br />