My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-24_REVISION - M1977301
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977301
>
2014-07-24_REVISION - M1977301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:38 PM
Creation date
7/24/2014 4:01:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977301
IBM Index Class Name
Revision
Doc Date
7/24/2014
Doc Name
TR Submittal.
From
Pete Lien & Sons, Inc.
To
DRMS
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been fully reclaimed. The area worked was approximately 3.8 acres. Concurrent <br /> reclamation was completed during this phase. The sandstone overburden was backfilled <br /> into the excavation left by extraction of the limestone, leveled and contoured. The topsoil <br /> from TS area was spread over the sandstone at a depth of 6" to 12". Seeding was <br /> completed with a mixture of Indian rice grass and Annual rye. <br /> Phase IV Will be stripped and mined. The topsoil will be removed, stockpiled, preserved and <br /> vegetated in TS area or used immediately in reclamation. The sandstone and overburden <br /> material will be stripped and stockpiled south of TS, or placed in areas which have been <br /> mined out as backfill to facilitate concurrent reclamation. This phase is expected to <br /> require 10 years from 2010 to 2020 and will occur concurrently in 2 locations. The total <br /> area worked is expected to be 22 acres. <br /> Phase V Will be stripped and mined. This is expected to require 10 years. The total area worked <br /> at this time is expected to be 30 acres. Reclamation will continue concurrently with <br /> mining through this phase whenever possible as outlined in Phase VI. <br /> Phase VI Reclamation will be completed during this phase. The sandstone overburden will be <br /> pushed back into the excavation left by the limestone leveled and contoured to a slope of <br /> less than 2 to 1. The topsoil will be leveled over the sandstone to a depth of 6" to 12". <br /> The area will be seeded with a mixture of Indian rice grass wheat grass, mountain <br /> mahogany and rabbit brush, to be hand broadcast at 18 lbs per acre, in the spring. This <br /> will be accomplished within 5 years of completion of mining. <br /> EXHIBIT D.(REV)MINE PLAN,ROBERTS QUARRY APRIL 2014,PAGE 3 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.