Laserfiche WebLink
�.Ov c <0 COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> ye �0 MINERALS PROGRAM INSPECTION REPORT <br /> � PHONE: (303) 866-3567 <br /> The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Swan River Resource M-1993-035 Gravel Summit <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Monitoring Eric C. Scott July 17,2014 13:00 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Summit County and Town of Breckenridge None 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Normal I&E Program None $0.00 <br /> DATE OF COMPLAINT: POST INSP.CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INS TOR'S N E: SIGNATURE DATE: <br /> Clear July 21,2014 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Signs & Markers <br /> PROBLEM/POSSIBLE VIOLATION: Problem:The affected area boundary markers are missing or incorrectly <br /> placed. This is a problem for failure to maintain boundary markers around the affected area as required by <br /> Section 3.1.12(2) of the rule. <br /> CORRECTIVE ACTIONS:The operator shall conduct a survey and replace the boundary markers in the correct <br /> location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br /> date. <br /> CORRECTIVE ACTION DUE DATE: 8/29/14 <br /> Page 1 of 4 <br />