Laserfiche WebLink
PERMIT#: M-1981-185 <br /> INSPECTOR'S INITIALS:KAP <br /> INSPECTION DATE:July 9,2014 <br /> OBSERVATIONS <br /> This inspection was conducted as part of the ongoing monitoring of the road installation. The final portions of <br /> the project are complete. This inspection focused on the newly installed guardrail and the sediment basin <br /> drain. All of the final installations appear adequate. Ray Fuergeson was at the site. He stated that he dug out <br /> along the uphill side or the road so that precipitation water would be directed down the hill. The as built <br /> reports still need to be reviewed for final assessment of the entire project, including the final installations. <br /> Page 2 of 4 <br />