Laserfiche WebLink
Page 2 of 3 <br /> 112c Annual Report <br /> Permittee Name: Southway Construction Permit Number: M-1984-025 <br /> Com an , Inc. <br /> Operation Name: Stage Stop Pit County: Saguache <br /> Annual Fee Due: $791.00 Anniversary Date: July 26,2014 <br /> Permit Acreage: 40.00 Current Bond Amt: $55,081.00 <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance . <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES O <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). 69)� NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? Kl—n LA 0U-)ry) <br /> 5. Does the mine operate more than 180 days per year? YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES NO <br /> b) approval for INTERMITTENT OPERATION? S NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). 2 S-- <br /> 8. Number of acres that were newly affected during the current report year. RECEIVED eq <br /> 9. Number of acres that were reclaimed during the current report year. JUL 18 7014 0 <br /> 10. Estimated new acreage to be affected in the next report year. p1lISION OF RmAma <br /> WININGAND SAFETY <br /> 11. Estimated acres to be reclaimed in the next report year. <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil 7 mulched w/ <br /> .-Zl approved mix: replaced: l approved mulch: <br /> Total acres ,f Total acres Topsoil Mulch application <br /> graded: fertilized w/ 7, replacement ' rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application �� application <br /> method: method: method: /�� <br />