My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-17_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-07-17_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:51 PM
Creation date
7/17/2014 11:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
7/17/2014
Doc Name
Reclamation Cost Estimate
From
Jim Stark
To
Zack Trujillo
Type & Sequence
RN6
Email Name
ZTT
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade D- Portal Area <br />Site: Deserado Mine Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine: <br />Horsepower <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />1IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Page 1 of 2 <br />Permit/Job #: C1981018 <br />Abbreviation: None <br />Filename: 002 <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $1,049.04 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $1,049.04 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />160,750 <br />Swell factor: <br />1.111 <br />Loose volume: <br />178,593 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />250 feet <br />546.0 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight <br />Weight description: <br />0% <br />5,300 feet <br />2,743 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.