My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-17_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-07-17_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:51 PM
Creation date
7/17/2014 11:10:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
7/17/2014
Doc Name
Reclamation Cost Estimate
From
Jim Stark
To
Zack Trujillo
Type & Sequence
RN6
Email Name
ZTT
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 000 Page 3 of 3 <br />115 <br />Site Maintenance During Reclamation and Ten- <br />SITEMAINT <br />1 <br />400.00 <br />$130,274.00 <br />Total = <br />Year Liability <br />ENANCE <br />Total = <br />$156,332.80 <br />120 <br />1 <br />$38,901.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />10.00 <br />TOTAL O & P = <br />Reclamation <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$5,196,402.05 <br />121 <br />1 <br />$6,302.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />10.00 <br />Total = <br />Reclamation <br />Engineering work and /or contract/bid preparation: <br />4.61% <br />Total = <br />$239,554.13 <br />122 <br />1 <br />$4,698.00 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />10.00 <br />Total = <br />Cleanining/Maintenanc <br />TOTAL INDIRECT COST = <br />$1,164,510.38 <br />SUBTOTALS: <br />4709.64 <br />$4,457,477 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: 2.02% <br />Total = <br />$90,041.04 <br />Performance bond: 1.05% <br />Total = <br />$46,803.51 <br />Job superintendent: 2,080.00 hrs <br />Total = <br />$156,332.80 <br />Profit: 10.00% <br />Total = <br />$445,747.70 <br />TOTAL O & P = <br />$738,925.05 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$5,196,402.05 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.61% <br />Total = <br />$239,554.13 <br />Reclamation management and /or administration: <br />3.58% <br />$186,031.19 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$1,164,510.38 <br />TOTAL BOND AMOUNT (direct + indirect) = $5,621,987.38 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.