Laserfiche WebLink
Mobilization Worksheet Cont'd Task#009 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: __ CORTREZ <br /> Total one-way travel distance: 15.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $7,190.04 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost*' <br /> ** one round trip,no haul rig: $9.18 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment E ui ment _ <br /> Haul Time(Hours): 0.30 0.30 _ <br /> Return Time(Hours): 0.30 -t - 0.30 <br /> Loading Time(Hours): 1.50 NA <br /> Unloading Time(Hours): 1.50 NA <br /> Subtotals: 3.60-_ 0.60 <br /> JOB TIME AND COST <br /> Total job time: 7.20 Hours <br /> Total job cost: $7,199 <br /> CIRCES Cost Estimating Software <br />