Laserfiche WebLink
COLORADO DIVISION OF RECLAMATION MINING AND SAFETY <br /> 87 1313 Sherman Street, Room 215, Denver,Colorado 80203 ph(303)866-3567 <br /> " <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> Fi le No.: M- �d o y - o a g Site Name: .L e B G r4 v el P/* <br /> County '415 4y,N,4-5 TR# (DRMS Use only) <br /> Permittee: �e,4- h- .�eve S�' „�Pv/1' 5! '`�d ( GSA✓� <br /> Operator(If Other than Permittee): <br /> Permittee Representative: i �s ,4u j( •L c©'ry r'— <br /> Please provide a brief description of the proposed revision: <br /> .2 $ /Mire ,, _.r� �4wgL.:� <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. if the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) RECEIVED $175 ❑ <br /> 1 IOd, 1 12d(l, 2 or 3) JUG 16 Z014 $1006 F7 <br /> Division of Reclamation,am <br /> Mining <br />