My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-15_REPORT - P2012004
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2012004
>
2014-07-15_REPORT - P2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 6:47:41 AM
Creation date
7/16/2014 7:02:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012004
IBM Index Class Name
REPORT
Doc Date
7/15/2014
From
Thomas G. Miller
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Fee/Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vii. TERMS AND CONDITIONS <br /> A. If a bond is required,it must be furnished before approval of the plan of operations. <br /> B. Information provided with this plan marked confidential will be treated in accordance with the agency's <br /> laws,rules,and reams. <br /> C. Approval of this pin does not constitute certification of ownership to any person named herein and/or <br /> recognition of the validity of any mining claim named herein. <br /> D. Approval of this plan does not relieve ffe of my responsibility to comply with other applic" state or <br /> federal laws,rules,or regulations. <br /> E. .f previously undiscovered cutturai resources 0*ftric or prehistoric objects,ar facts,or sites)are exposed <br /> as a result of operations,those operations will not proceed until notification Is received from the Authorised <br /> Officer that provisions for mhfgaWV unfaresee:t impacts as required by 36 CFR 228.4(e)and 36 CFR <br /> have bow compiled with. <br /> F. This plan of operations has been approved for a period of tom' or undl (=Vd*y)ill3i/1-1 <br /> revised plan must be submitted in accordance with 36 CFR part 226, subpart A, if operatbns are to be <br /> continued after that time period, <br /> Vill. OPERATING PUN ACCEPTANCE <br /> gwe] have reviewed and agreed to comply with all conditions In this plan of operations Including the <br /> required changes,modifications,special mlrigation,and reclamation regtl�atltsnts. <br /> I�We understand that the bond will not be released Until the Authorized Officer In change gives written <br /> a ai <br /> Mature of perato (or riz Representative) (fie) <br /> (mrMatcf�y) <br /> V.OPERATING PUN APPROVAL <br /> (Nam) (Tim) <br /> Si re of(Authorized Officer) f <br /> (Date) <br /> (mra/ddW <br /> b tra r Burden and Non-oiscftkurdw Ste wwd <br /> eparNork(tsair fan Ad d r9P3 an WnW rear not cmakw ar wwy w4 s n,R z Mi W--jdM ra�a2�+to s aol4clb d Pkiasatrcn uta:c 3 rya r✓ 7 CYAS wrBrw <br /> tu* the wild QIM ciV k +aaebw tr aw tMaawatbtt Colrr�ort!t 0596Q�l. the!hr®rept/red 7o Complete W5+d0tnuim CoiaCehr,s sskmaMd b awraya t2 Lass 0�ratpanaa, <br /> orrr.iny dw tl e.Axn,�a,,:tp awrt�p dw satsws,partrap andau6ttasnp ina dare rwadad andoosaytltp and rerisr,r,y#w collod�art d:w6rar,eravr. <br /> " U.B Oga AW^a Ap ucn(uSMj A dtarbrtteaev In rl!b PbIPMtt end aet„IFas an the basrs d race taros,nsdunr arVn spa dadry,and mime sox,marled <br /> t6W lamrptl vets pantt{tl �,`arm o,ttttlerm,yarNlC M1 PaMaa�bats6,+aKtAcat,a As tame M ar part of an r rruvna b oYtt ed tam auy pttle aadalsrke. <br /> QVaragprotraipd bow ofZ bram)FYtaowI dea6NtraswAdrvaw.+Mrni/4.wartpxcwrnwric don <br /> dpoggm1,Ibre,atm�8riekYaF�tCaudareps4.I:)a�aroCaxact <br /> u5OAs TARl3ETQKMr�s'Yp-TsV,�(tnloe and Tmj <br /> eat eaea O i * ar LSDA Oft of cd Rtft,14M Wipendanu Av~,SW,Washsr0loa,nC 20?j0.Sa;0 of Car W has(8or)ti7?i�p(vakx► TDo arms <br /> "carat(�o)en-s�v(rpo1or1e�3nar��nerayrarc�� usoA�s,,,r�eta�on�>kyva.awandwt+aror■. <br /> of wo►t spats&needed ro)w out a u0cA of lwforweaAon,we ad,&w* !.rheas and <br /> atheh fernt) <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.