Laserfiche WebLink
7/15/2014 State.co.us Executive Branch Mail-2014 Warranty Update Re\Ased Spreadsheets <br /> STATE OF <br /> COLORADO Cazier - DNR, Tim <tim.cazier@state.co.us> <br /> 2014 Warranty Update Revised Spreadsheets <br /> 1 message <br /> ---.-------------____ _ ___. ------ __________--_.__-___- <br /> �W Campbell, Jeff<JCampbell@anglogoldashanti.com> c e- Tue, Jul 15, 2014 at 9:18 AM <br /> To: "Cazier- DNR, Tim" <tim.cazier@state.co.us> pR-fts <br /> Cc: "Comer, Timm" <TComer@anglogoldashanti.com>, "Hanks, Chris" <CHanks@anglogoldashanti.com>, "Tidquist, <br /> Marc" <MTidquist@anglogoldashanti.com> <br /> Tim, <br /> Attached are revised worksheets for the 2014 Reclamation Warranty Update for the Cresson <br /> Project. The revised worksheets include the TR worksheet with TR59 removed and a revised <br /> summary sheet with the corrected total reclamation estimate (with TR59 removed). <br /> Additionally, I have included a Phased Warranty Calculation spreadsheet which we reviewed <br /> with you. Changes to this spreadsheet include revisions based on the new total cost estimate <br /> (removal of TR59), revised warranty surplus, and minor rounding changes. Finally, I have <br /> included a revised Warranty discussion that was initially included in the last Cresson Project <br /> Annual Report. This text updates the reclamation cost estimate and warranty amounts per the <br /> changes noted here. <br /> Please let me know if you have any questions or would like to discuss these revisions. <br /> Thanks. <br /> Jeff Campbell <br /> Senior Environmental Coordinator <br /> Cripple Creek&Victor Gold Mining Co. <br /> AngloGold Ashanti(Colorado) Corp. <br /> ANGLO(-- AsHANT1 <br /> CRIPPLE CREEK&VlUrOfi <br /> USA <br /> https://mail.g oog l e.corrVmai I/u/0/?ui=2&i Ir 5fO9c8c280&\A evs pt&search=i nbox&th=1473a9c9fa4948e9&si ml=1473a9cgfa4948e9 1/2 <br />