My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-14_HYDROLOGY - C1996083
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1996083
>
2014-07-14_HYDROLOGY - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:43 PM
Creation date
7/15/2014 9:44:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Hydrology
Doc Date
7/14/2014
Doc Name
2nd Quarter 2014 Sediment Pond Inspection Report (Emailed)
From
J. E. Stover & Associates, Inc.
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
id Identification <br />e of Pond <br />:us During Inspection: <br />roximate Water Level <br />iment ( % remaining) <br />low (cfs) <br />)sional <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />QUARTERLY POND INSPECTION REPORT <br />Bowie Resources LLC <br />Bowie No. 2 Mine - C- 1996 -083 <br />Quarter: I Second 201 <br />Inspection Date: I 30- Jun -14 <br />B <br />C <br />D - Gob Pile <br />F - New Gob <br />J UTL East <br />K UTL West <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />Sediment <br />dry/mud <br />5945 <br />dry1mud <br />dry/mud <br />5848 <br />Dry <br />10 % <br />90% <br />70 % <br />0 % <br />40% <br />800 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />No <br />No <br />Problem <br />Problem Problem <br />Problem <br />Problem <br />Problerr <br />Yes /No <br />YeslNo Yes/No <br />Yes /No <br />Yes/No <br />Yes/No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />Differential Settling <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />Cracks or Slides <br />No <br />No <br />No <br />No <br />No <br />No <br />Seepage <br />No <br />No <br />No <br />No <br />No <br />No <br />Other <br />Appurtenant Structures <br />Defective Spillways <br />No <br />No <br />No <br />No <br />No <br />No <br />Dewatering Devices Clogged <br />No <br />No <br />No <br />No <br />No <br />No <br />Faulty Gates, Etc. <br />No <br />No <br />No <br />No <br />No <br />No <br />Other <br />No <br />No <br />No <br />No <br />No <br />No <br />Additional Comments Design depth measured from pond bottom to invert of emergency spillway: <br />Pond B =10, C =10, D =6.5, J =10, K =3, F =10' TD <br />Pond Bottom Elevations B =5942, C =5990, D =5970, J =5846, F =5944, K =5819 <br />Pond B, Pond is nearly de- watered and summer maintenance work has begun cleaning out sediment. <br />Pond C has a water level about about three feet above at the level of the primary spillway. <br />Pond D, no visual water surface observed. Sediment removal scheduled for July. <br />Pond J Most of the irrigation water (from Barnes' field) had been pumped out before the inspection. <br />Pond K was dry.►, <br />Pond F, no visual water surface observed, sediment removal was underway. '9n,Air�._ ,�`� <br />The GVB16A,16D,17B,17C and 17F mud pits were inspected by mine per >> n6 f y� <br />probems noted. ®�p.�*:� <br />Maintenance Required: e <br />Name of Inspector: Tamme Bishop ilk -e -,/IV -) "'Iwo, <br />J. °Po <br />Colors ®jr,�E <br />
The URL can be used to link to this page
Your browser does not support the video tag.