Laserfiche WebLink
July 9, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />Toe of Gob Pile #4 foreground, Gob Pile #3 in center <br />Upper bench of Gob Pile #2, looking east <br />Upper bench of Gob Pile #2, looking northeast <br />Material stockpiled at upper Gob Pile #2 expansion area Pond F inlet <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br />Page 6 of 8 <br />