Laserfiche WebLink
PERMIT#: M-1980-146 <br /> INSPECTOR'S INITIALS: KAP <br /> INSPECTION DATE:June 30,2014 <br /> OBSERVATIONS <br /> This inspection was conducted as part of the Division or Reclamation, Mining and Safety monitoring program. <br /> The site is fully active. There is a near vertical highwall on the northern end of the site. The highwall to the <br /> east has been partially graded and seeded. The remainder needs to be graded, which can be done from <br /> above, since large stockpiles of fill material are located at the top of the slope. The highwall on the western <br /> side of the site will be mined through and daylight into the adjacent, county pit. There is an abundance of <br /> overburden at the site, therefore ample material is available for final grading. The deep pit to the east will be <br /> filled with some of the excess fill material. Some of the stockpiled overburden is slated to be moved prior to <br /> final reclamation. The 'island' of material located in the center of the site is going to be mined out. <br /> A financial warranty calculation was conducted as part of this inspection. The amount held by the Division <br /> appears to be adequate. The calculation for the BLM portion of the site was forwarded to Helen Mary <br /> Johnson, of BLM, for her review. <br /> Page 2 of 4 <br />